eCFR Atlas
API

15 CFR Part 783

Part 783—Civil Nuclear Fuel Cycle-Related Activities Not Involving Nuclear Materials

Commerce and Foreign Trade · Chapter VII, Chapter VII—Bureau of Industry and Security, Department of Commerce · Subchapter D

15 CFR Part 783
Official text on eCFR ↗
Words
14,523
Sections
4
Last amended
May 22, 2020

15 CFR Part 783

Text as published by eCFR on .

PART 783—CIVIL NUCLEAR FUEL CYCLE-RELATED ACTIVITIES NOT INVOLVING NUCLEAR MATERIALS

Authority:

United States Additional Protocol Implementation Act of 2006, Pub. Law No. 109-401, 120 Stat. 2726 (December 18, 2006) (to be codified at 22 U.S.C. 8101-8181); Executive Order 13458 (February 4, 2008).

Source:

73 FR 65128, Oct. 31, 2008, unless otherwise noted.

§ 783.1 Reporting requirements.

(a) Initial report. You must submit an Initial Report to BIS, no later than December 1, 2008 (see supplement no. 1 to this part), if you were engaged in any of the civil nuclear fuel cycle-related activities described in this paragraph (a) on October 31, 2008 or you were engaged in any such activities involving uranium hard-rock mines, including those that were closed down during calendar year 2008, (up to and including October 31, 2008). If you commenced any of the civil nuclear fuel cycle-related activities described in this paragraph (a) after October 31, 2008, you must submit an Initial Report on these activities to BIS no later than January 31 of the year following the calendar year in which the activities commenced (see supplement no. 1 to this part). You may report these activities as part of your Annual Update Report, in lieu of submitting a separate Initial Report, if you also have an Annual Update Report requirement that applies to the same location and covers the same reporting period (see paragraph (b) of this section). In order to satisfy the Initial Report requirements under this paragraph (a), you must complete and submit to BIS Form AP-1, Form AP-2, and other appropriate Forms, as provided in this paragraph (a).

(1) Research and development activities not involving nuclear material. You must report to BIS any of the civil nuclear fuel cycle-related research and development activities identified in paragraphs (a)(1)(i) and (a)(1)(ii) of this section. Activities subject to these APR reporting requirements include research and development activities related to safe equipment operations for a nuclear fuel cycle-related activity, but do not include activities related to theoretical or basic scientific research or to research and development on industrial radioisotope applications, medical, hydrological and agricultural applications, health and environmental effects and improved maintenance.

(i) You must complete Form AP-3 and submit it to BIS, as provided in § 782.6 of the APR, if you conducted any civil nuclear fuel cycle-related research and development activities defined in § 781.1 of the APR that:

(A) Did not involve nuclear material; and

(B) Were funded, specifically authorized or controlled by, or conducted on behalf of, the United States.

(ii) You must complete Form AP-4 and submit it to BIS, as provided in § 782.6 of the APR, if you conducted any civil nuclear fuel cycle-related research and development activities defined in § 781.1 of the APR that:

(A) Did not involve nuclear material;

(B) Were specifically related to enrichment, reprocessing of nuclear fuel, or the processing of intermediate or high-level waste containing plutonium, high enriched uranium or uranium-233 (where “processing” involves the separation of elements); and

(C) Were not funded, specifically authorized or controlled by, or conducted on behalf of, the United States.

(2) Civil nuclear-related manufacturing, assembly or construction activities. You must complete Form AP-5 and submit it to BIS, as provided in § 782.6 of the APR, if you engaged in any of the activities specified in supplement no. 2 to this part.

(3) Uranium hard-rock mining and ore beneficiation activities. You must complete Form AP-6 and submit it to BIS, as provided in § 782.6 of the APR, if your location is either a uranium hard-rock mine or an ore beneficiation plant that was in operating or suspended status (see § 781.1 of the APR for the definitions of “uranium hard-rock mine” and uranium hard-rock mines in “operating,” “suspended,” or “closed-down” status).

(i) The Initial Report requirement for calendar year 2008 applies to:

(A) Uranium hard-rock mines or ore beneficiation plants that were in operating or suspended status on October 31, 2008; and

(B) Uranium hard-rock mines that have changed from operating or suspended status to closed-down status during calendar year 2008 (up to and including October 31, 2008). Mines that were closed down prior to calendar year 2008 and that remain in closed-down status do not have a reporting requirement.

(ii) You are required to submit an Initial Report to BIS, for any calendar year that follows calendar year 2008, only if you commenced operations at a uranium hard-rock mine or an ore beneficiation plant during the previous calendar year (e.g., the commencement of operations would include, but not be limited to, the resumption of operations at a mine that was previously in “closed-down” status). Otherwise, see the Annual Update Report and No Changes Report requirements in paragraphs (b)(1) or (b)(2) of this section. For example, you must submit an Annual Update Report to indicate the closed-down status of any uranium hard-rock mine that was indicated in your most recent report to be in either operating or suspended status, but at which you ceased operations during the previous calendar year.

(b) Annual reporting requirements. You must submit either an Annual Update Report or a No Changes Report to BIS, as provided in § 782.6 of the APR, if, during the previous calendar year, you continued to engage in civil nuclear fuel cycle-related activities at a location for which you submitted an Initial Report to BIS in accordance with the APR reporting requirements described in paragraph (a) of this section.

(1) Annual Update Report. You must submit an Annual Update Report to BIS if you have updates or changes to report concerning your location's activities during the previous calendar year. When preparing your Annual Update Report, you must complete the same report forms that you used for submitting your Initial Report on these activities. However, additional report forms will be required if your location engaged in any civil nuclear fuel cycle-related activities described in paragraph (a) of this section that you did not previously report to BIS. The appropriate report forms for each type of activity that must be reported under the APR are identified in paragraphs (a)(1) through (a)(3) of this section. You must submit your Annual Update Report to BIS no later than January 31 of the year following any calendar year in which the activities took place or there were changes to previously “reported” activities (see supplement no. 1 to this part).

(2) No Changes Report. You may submit a No Changes Report, in lieu of an Annual Update Report, if you have no updates or changes concerning your location's activities (except the certifying official and dates signed and submitted) since your most recent report of activities to BIS. In order to satisfy the reporting requirements under this paragraph (b)(2), you must complete Form AP-16 and submit it to BIS, as provided in § 782.6 of the APR, no later than January 31 of the year following any calendar year in which there were no changes to previously “reported” activities or location information (see supplement no. 1 to this part).

(3) Additional guidance on annual reporting requirements. (i) If your Initial Report or your most recent Annual Update Report for a location indicates that all civil nuclear fuel cycle-related activities described therein have ceased at that location, and no other reportable activities have occurred during the previous calendar year, then you do not have a reporting requirement for the location under paragraph (b) of this section.

(ii) If your location ceases to engage in activities subject to the APR reporting requirements described in paragraph (a) of this section, and you have not previously reported this to BIS, you must submit an Annual Update Report covering the calendar year in which you ceased to engage in such activities.

(iii) Closed-down mines should be reported only once.

(c) Import Confirmation Report. You must complete Forms AP-1, AP-2 and AP-14 for each import of equipment or non-nuclear material identified in supplement no. 3 to this part and submit these forms to BIS, as provided in § 782.6 of the APR, if BIS sends you written notification requiring that you provide information concerning imports of such equipment and non-nuclear material. These Forms must be submitted within 30 calendar days of the date that you receive written notification of this requirement from BIS (see supplement no. 1 to this part). BIS will provide such notification when it receives a request from the IAEA for information concerning imports of this type of equipment or non-nuclear material. The IAEA may request this information to verify that you received specified equipment or non-nuclear material that was shipped to you by a person, organization, or government from a foreign country.

(d) Supplemental Information Report. You must complete Forms AP-1, AP-2 and AP-15 and submit them to BIS, as provided in § 782.6 of the APR, if BIS sends you written notification requiring that you provide information about the activities conducted at your location, insofar as relevant for the purpose of safeguards. These Forms must be submitted within 15 calendar days of the date that you receive written notification of this requirement from BIS (see supplement no. 1 to this part). BIS will provide such notification only if the IAEA specifically requests amplification or clarification concerning any information provided in the U.S. Declaration based on your report(s).

(e) Reportable location. A location that must submit an Initial Report, Annual Update Report, or No Changes Report to BIS, pursuant to the requirements of this section, is considered to be a reportable location with declared activities.

§ 783.2 Amended reports.

In order for BIS to maintain accurate information on previously submitted reports, including information necessary for BIS to facilitate complementary access notifications or to communicate reporting requirements under the APR, Amended Reports are required under the circumstances described in paragraphs (a), (b), and (d) of this section. This section applies only to changes affecting Initial Reports and Annual Update Reports that were submitted to BIS in accordance with the requirements of § 783.1(a) and (b) of the APR. The specific report forms that you must use to prepare and submit an Amended Report will depend upon the type of information that you are required to provide, pursuant to this section.

(a) Changes to activity information. You must submit an Amended Report to BIS within 30 calendar days of the time that you discover an error or omission in your most recent Initial Report or Annual Update Report that involves information concerning an activity subject to the reporting requirements described in § 783.1(a) or (b) of the APR. Use Form AP-1, and any applicable report forms indicated for the activities identified in § 783.1(a) of the APR, to prepare your Amended Report. Submit your Amended Report to BIS, as provided in § 782.6 of the APR.

(b) Changes to organization and location information that must be maintained by BIS—(1) Internal organization changes. You must submit an Amended Report to BIS within 30 calendar days of any change in the following information (use Form AP-1 to prepare your Amended Report and submit it to BIS, as provided in § 782.6 of the APR):

(i) Name of report point of contact (R-POC), including telephone number, facsimile number, and e-mail address;

(ii) Name(s) of complementary access point(s) of contact (A-POC), including telephone number(s), facsimile number(s) and e-mail address(es);

(iii) Organization name;

(iv) Organization mailing address;

(v) Location owner, including telephone number, and facsimile number; or

(vi) Location operator, including telephone number, and facsimile number.

(2) Change in ownership of organization. You must submit an Amended Report to BIS if you sold a reportable location or if your reportable location went out of business since submitting your most recent Initial Report, Annual Update Report, or No Changes Report to BIS. You must also submit an Amended Report to BIS if you purchased a reportable location that submitted an Initial Report, Annual Update Report, or No Changes Report to BIS for the most recent reporting period, as specified in § 783.1(a) and (b) of the APR. Submit your Amended Report to BIS, as provided in § 782.6 of the APR, either before the effective date of the change in ownership or within 30 calendar days after the effective date of the change.

(i) The following information must be included in an Amended Report submitted to BIS by an organization that is selling or that has sold a reportable location (use Forms AP-1 and AP-16 to prepare your Amended Report—address specific details regarding the sale of a reportable location in Form AP-16):

(A) Name of seller (i.e., name of the organization selling a reportable location);

(B) Reporting Code (this code will be assigned to your location and reported to you by BIS after receipt of your Initial Report);

(C) Name of purchaser (i.e., name of the new organization/owner purchasing a reportable location) and name and address of contact person for the purchaser, if known;

(D) Date of ownership transfer or change;

(E) Additional details on the sale of the reportable location relevant to ownership or operational control over any portion of the reportable location (e.g., whether the entire location or only a portion of the reportable location has been sold to a new owner); and

(F) Details regarding whether the new owner of a reportable location will submit the next report for the entire calendar year in which the ownership change occurred, or whether the previous owner and new owner will submit separate reports for the periods of the calendar year during which each owned the reportable location.

(ii) The following information must be included in an Amended Report submitted to BIS by an organization that is purchasing or that has purchased a reportable location (use Forms AP-1 and AP-2 to prepare your Amended Report):

(A) Name of purchaser (i.e., name of the new organization/owner purchasing a reportable location) and name and address of contact person for the purchaser;

(B) Details on the purchase of the reportable location relevant to ownership or operational control over any portion of the reportable location (e.g., whether the purchaser intends to purchase and to maintain operational control over the entire location or only a portion of the reportable location); and

(C) Details on whether the purchaser intends to continue existing civil nuclear fuel cycle-related activities at the reportable location or to cease such activities during the current reporting period.

(iii) If the new owner of a reportable location is responsible for submitting a report that covers the entire calendar year in which the ownership change occurred, the new owner must obtain and maintain possession of the location's records covering the entire year, including those records for the period of the year during which the previous owner still owned the property.

(c) Non-substantive changes. If you discover one or more non-substantive typographical errors in your Initial Report or Annual Update Report, after submitting the report to BIS, you are not required to submit an Amended Report to BIS. Instead, you may correct these errors when you submit your next Annual Update Report to BIS.

(d) Amendments related to complementary access. If you are required to submit an Amended Report to BIS following the completion of complementary access (see Part 784 of the APR), BIS will notify you, in writing, of the information that must be amended pursuant to § 784.6 of the APR. Complete and submit Form AP-1 (organization information) and/or the specific report forms required by section 783.1(a) or (b) of the APR, according to the type(s) of activities for which information is being requested. You must submit your Amended Report to BIS, as provided in § 782.6 of the APR, no later than 30 calendar days following your receipt of BIS's post complementary access letter.

(e) Option for submitting amended reports in letter form. If you are required to submit an Amended Report to BIS, pursuant to paragraph (a), (b), or (d) of this section, BIS may permit you to submit your report in the form of a letter that contains all of the corrected information required under this section. Your letter must be submitted to BIS, at the address indicated in § 782.6 of the APR, no later than the applicable due date(s) indicated in this section (also see supplement no. 1 to this part).

§ 783.3 Reports containing information determined by BIS not to be required by the APR.

If you submit a report and BIS determines that none of the information contained therein is required by the APR, BIS will not process the report and will notify you, either electronically or in writing, explaining the basis for its decision. BIS will not maintain any record of the report. However, BIS will maintain a copy of the notification.

§ 783.4 Deadlines for submission of reports and amendments.

Reports and amendments required under this part must be postmarked by the appropriate date identified in supplement no. 1 to this part 783. Required reports and amendments include those identified in paragraphs (a) through (g) of this section.

(a) Initial Report: Submitted by a location that commenced one or more of the civil nuclear fuel cycle-related activities described in § 783.1(a) of the APR during the previous calendar year, but that has not yet reported such activities to BIS. However, Initial Reports that are submitted to BIS during calendar year 2008 must describe only those activities in which you are engaged as of October 31, 2008, except that the description of activities involving uranium hard-rock mines must include any such mines that were closed down during calendar year 2008 (up to and including October 31, 2008), as well as mines that were in either operating or suspended status on October 31, 2008 (see § 783.1(a)(3)(i) of the APR).

(b) Annual Update Report: Submitted by a reportable location—this report describes changes to previously reported (i.e., declared) activities and any other reportable civil nuclear fuel cycle-related activities that took place at the location during the previous calendar year.

(c) No Changes Report: Submitted by a reportable location, in lieu of an Annual Update Report, when there are no updates or changes to any information, excluding the certifying official and dates signed and submitted, since the previous report submitted by that location.

(d) Import Confirmation Report: Submitted in response to a written notification from BIS, following a specific request by the IAEA.

(e) Supplemental Information Report: Submitted in response to a written notification from BIS, following a specific request by the IAEA.

(f) Amended Report: Submitted by a reportable location to report certain changes affecting the location's most recent Initial Report or Annual Update Report.

Supplement No. 1 to Part 783—Deadlines for Submission of Reports and Amendments

Reports Applicable forms Due dates
Initial Report Forms AP-1 and AP-2 and:
—AP-3 or AP-4 for R&D activities;
—AP-5 for civil nuclear-related manufacturing, assembly or construction; and
—AP-6 for mining and ore beneficiation
December 1, 2008 for:
(1) Any activities in which you were engaged on October 31, 2008 and
(2) uranium hard-rock mines that have changed from operating or suspended status to closed-down status during calendar year 2008 (up to and including October 31, 2008).
For activities commencing after October 31, 2008, Initial Reports must be submitted no later than January 31 of the year following any calendar year in which the activities began, unless you are required to submit an Annual Update Report because of on-going previously “reported” activities at the same location—in that case, you may include the new activities in your Annual Update Report, instead of submitting a separate Initial Report.
Annual Update Report Forms AP-1 and AP-2 and:
—AP-3 or AP-4 for R&D activities;
—AP-5 for civil nuclear-related manufacturing, assembly or construction; and
January 31 of the year following any calendar year in which the activities took place or there were changes to previously “reported” activities.

—AP-6 for mining and ore beneficiation
No Changes Report Form AP-17 January 31 of the year following any calendar year in which there were no changes to previously “reported” activities or location information.
Import Confirmation Report Forms AP-1, AP-2, and AP-14 Within 30 calendar days of receiving notification from BIS.
Supplemental Information Report Forms AP-1, AP-2, and AP-15 Within 15 calendar days of receiving notification from BIS.
Amended Report:
—Report information
—Organization and location information
—Complementary access letter
Form AP-1 and appropriate forms, as specified in § 783.1 of the APR, for the type of report being amended Amended report due:
—30 calendar days after you discover an error or omission in activity information contained in your most recent report.
—30 calendar days after a change in company information or ownership of a location.
—30 calendar days after receipt of a post-complementary access letter from BIS.

Supplement No. 2 to Part 783—Manufacturing Activities

The following constitute manufacturing activities that require the submission of a report to BIS, pursuant to § 783.1(a)(2) of the APR.

(1) The manufacture of centrifuge rotor tubes or the assembly of gas centrifuges. Centrifuge rotor tubes means thin-walled cylinders as described in section 5.1.1(b) of supplement no. 3 to this part. Gas centrifuges means centrifuges as described in the Introductory Note to section 5.1 of supplement no. 3 to this part.

(2) The manufacture of diffusion barriers. Diffusion barriers means thin, porous filters as described in section 5.3.1(a) of supplement no. 3 to this part.

(3) The manufacture or assembly of laser-based systems. Laser-based systems means systems incorporating those items as described in section 5.7 of supplement no. 3 to this part.

(4) The manufacture or assembly of electromagnetic isotope separators. Electromagnetic isotope separators means those items referred to in Section 5.9.1 of supplement no. 3 to this part containing ion sources as described in section 5.9.1(a) of supplement no. 3 to this part.

(5) The manufacture or assembly of columns or extraction equipment. Columns or extraction equipment means those items as described in sections 5.6.1, 5.6.2, 5.6.3, 5.6.5, 5.6.6, 5.6.7, and 5.6.8 of supplement no. 3 to this part.

(6) The manufacture of aerodynamic separation nozzles or vortex tubes. Aerodynamic separation nozzles or vortex tubes means separation nozzles and vortex tubes as described, respectively, in sections 5.5.1 and 5.5.2 of supplement no. 3 to this part.

(7) The manufacture or assembly of uranium plasma generation systems. Uranium plasma generation systems means systems for the generation of uranium plasma as described in section 5.8.3 of supplement no. 3 to this part.

(8) The manufacture of zirconium tubes. zirconium tubes means tubes as described in section 1.6 of supplement no. 3 to this part.

(9) The manufacture or upgrading of heavy water or deuterium. Heavy water or deuterium means deuterium, heavy water (deuterium oxide) and any other deuterium compound in which the ratio of deuterium to hydrogen atoms exceeds 1:5000.

(10) The manufacture of nuclear grade graphite. Nuclear grade graphite means graphite having a purity level better than 5 parts per million boron equivalent and with a density greater than 1.50 g/cm 3;

(11) The manufacture of flasks for irradiated fuel. A flask for irradiated fuel means a vessel for the transportation and/or storage of irradiated fuel that provides chemical, thermal and radiological protection, and dissipates decay heat during handling, transportation and storage.

(12) The manufacture of reactor control rods. Reactor control rods means rods as described in section 1.4 of supplement no. 3 to this part.

(13) The manufacture of critically safe tanks and vessels. Critically safe tanks and vessels means those items as described in sections 3.2 and 3.4 of supplement no. 3 to this part.

(14) The manufacture of irradiated fuel element chopping machines. Irradiated fuel element chopping machines means equipment as described in section 3.1 of supplement no. 3 to this part.

(15) The construction of hot cells. Hot cells means a cell or interconnected cells totaling at least 6 cubic meters in volume with shielding equal to or greater than the equivalent of 0.5 meters of concrete, with a density of 3.2 g/cm 3 or greater, outfitted with equipment for remote operations.

Supplement No. 3 to Part 783—List of Specified Equipment and Non-Nuclear Material for the Reporting of Imports

1. Reactors and equipment therefor

1.1. Complete nuclear reactors

Nuclear reactors capable of operation so as to maintain a controlled self-sustaining fission chain reaction, excluding zero energy reactors, the latter being defined as reactors with a designed maximum rate of production of plutonium not exceeding 100 grams per year.

1.2. Reactor pressure vessels

Metal vessels, as complete units or as major shop-fabricated parts therefor, which are specially designed or prepared to contain the core of a nuclear reactor, as defined in section 1.1, and are capable of withstanding the operating pressure of the primary coolant.

1.3. Reactor fuel charging and discharging machines

Manipulative equipment specially designed or prepared for inserting or removing fuel in a nuclear reactor, as defined in section 1.1 of this Supplement, capable of on-load operation or employing technically sophisticated positioning or alignment features to allow complex off-load fueling operations such as those in which direct viewing of or access to the fuel is not normally available.

1.4. Reactor control rods

Rods specially designed or prepared for the control of the reaction rate in a nuclear reactor as defined in section 1.1 of this Supplement.

1.5. Reactor pressure tubes

Tubes which are specially designed or prepared to contain fuel elements and the primary coolant in a reactor, as defined in section 1.1 of this supplement, at an operating pressure in excess of 5.1 MPa (740 psi).

1.6. Zirconium tubes

Zirconium metal and alloys in the form of tubes or assemblies of tubes, and in quantities exceeding 500 kg in any period of 12 months, specially designed or prepared for use in a reactor, as defined in section 1.1 of this supplement, and in which the relation of hafnium to zirconium is less than 1:500 parts by weight.

1.7. Primary coolant pumps

Pumps specially designed or prepared for circulating the primary coolant for nuclear reactors, as defined in section 1.1 of this Supplement.

2. Non-nuclear materials for reactors

2.1. Deuterium and heavy water

Deuterium, heavy water (deuterium oxide) and any other deuterium compound in which the ratio of deuterium to hydrogen atoms exceeds 1:5000 for use in a nuclear reactor, as defined in section 1.1 of this supplement, in quantities exceeding 200 kg of deuterium atoms for any one recipient country in any period of 12 months.

2.2. Nuclear grade graphite

Graphite having a purity level better than 5 parts per million boron equivalent and with a density greater than 1.50 g/cm 3 for use in a nuclear reactor, as defined in section 1.1 of this Supplement, in quantities exceeding 3 × 10 4 kg (30 metric tons) for any one recipient country in any period of 12 months.

3. Plants for the reprocessing of irradiated fuel elements, and equipment specially designed or prepared therefor

3.1. Irradiated fuel element chopping machines

3.2. Dissolvers

3.3. Solvent extractors and solvent extraction equipment

3.4. Chemical holding or storage vessels

(a) The pure uranium nitrate solution is concentrated by evaporation and passed to a denitration process where it is converted to uranium oxide. This oxide is re-used in the nuclear fuel cycle.

(b) The intensely radioactive fission products solution is normally concentrated by evaporation and stored as a liquor concentrate. This concentrate may be subsequently evaporated and converted to a form suitable for storage or disposal.

(c) The pure plutonium nitrate solution is concentrated and stored pending its transfer to further process steps. In particular, holding or storage vessels for plutonium solutions are designed to avoid criticality problems resulting from changes in concentration and form of this stream. Specially designed or prepared holding or storage vessels for use in a plant for the reprocessing of irradiated fuel. The holding or storage vessels must be resistant to the corrosive effect of nitric acid. The holding or storage vessels are normally fabricated of materials such as low carbon stainless steels, titanium or zirconium, or other high quality materials. Holding or storage vessels may be designed for remote operation and maintenance and may have the following features for control of nuclear criticality: (1) Walls or internal structures with a boron equivalent of at least two percent; (2) a maximum diameter of 175 mm (7 in) for cylindrical vessels; or (3) a maximum width of 75 mm (3 in) for either a slab or annular vessel.

3.5. Plutonium nitrate to oxide conversion system

3.6. Plutonium oxide to metal production system

4. Plants for the fabrication of fuel elements

A “plant for the fabrication of fuel elements” includes the equipment:

(a) Which normally comes in direct contact with, or directly processes, or controls, the production flow of nuclear material, or

(b) Which seals the nuclear material within the cladding.

5. Plants for the separation of isotopes of uranium and equipment, other than analytical instruments, specially designed or prepared therefor

Items of equipment that are considered to fall within the meaning of the phrase “equipment, other than analytical instruments, specially designed or prepared” for the separation of isotopes of uranium include:

5.1. Gas centrifuges and assemblies and components specially designed or prepared for use in gas centrifuges

5.1.1. Rotating components

(a) Complete rotor assemblies: Thin-walled cylinders, or a number of interconnected thin-walled cylinders, manufactured from one or more of the high strength to density ratio materials described in the Explanatory Note to section 5.1.1 of this supplement. If interconnected, the cylinders are joined together by flexible bellows or rings as described in section 5.1.1(c) of this supplement. The rotor is fitted with an internal baffle(s) and end caps, as described in section 5.1.1(d) and (e) of this supplement, if in final form. However the complete assembly may be delivered only partly assembled.

(b) Rotor tubes: Specially designed or prepared thin-walled cylinders with thickness of 12 mm (0.5 in) or less, a diameter of between 75 mm (3 in) and 400 mm (16 in), and manufactured from one or more of the high strength to density ratio materials described in the Explanatory Note to section 5.1.1 of this supplement.

(c) Rings or Bellows: Components specially designed or prepared to give localized support to the rotor tube or to join together a number of rotor tubes. The bellows is a short cylinder of wall thickness 3 mm (0.12 in) or less, a diameter of between 75 mm (3 in) and 400 mm (16 in), having a convolute, and manufactured from one of the high strength to density ratio materials described in the Explanatory Note to section 5.1.1 of this supplement.

(d) Baffles: Disc-shaped components of between 75 mm (3 in) and 400 mm (16 in) diameter specially designed or prepared to be mounted inside the centrifuge rotor tube, in order to isolate the take-off chamber from the main separation chamber and, in some cases, to assist the UF6 gas circulation within the main separation chamber of the rotor tube, and manufactured from one of the high strength to density ratio materials described in the Explanatory Note to section 5.1.1 of this supplement.

(e) Top caps/Bottom caps: Disc-shaped components of between 75 mm (3 in) and 400 mm (16 in) diameter specially designed or prepared to fit to the ends of the rotor tube, and so contain the UF6 within the rotor tube, and in some cases to support, retain or contain as an integrated part an element of the upper bearing (top cap) or to carry the rotating elements of the motor and lower bearing (bottom cap), and manufactured from one of the high strength to density ratio materials described in the Explanatory Note to section 5.1.1 of this supplement.

(a) Maraging steel capable of an ultimate tensile strength of 2.05 × 10 9 N/m 2 (300,000 psi) or more;

(b) Aluminum alloys capable of an ultimate tensile strength of 0.46 × 10 9 N/m 2 (67,000 psi) or more;

(c) Filamentary materials suitable for use in composite structures and having a specific modulus of 12.3 × 10 6 m or greater and a specific ultimate tensile strength of 0.3 × 10 6 m or greater (“Specific Modulus” is the Young's Modulus in N/m 2 divided by the specific weight in N/m 3; “Specific Ultimate Tensile Strength” is the ultimate tensile strength in N/m 2 divided by the specific weight in N/m 3).

5.1.2. Static components

(a) Magnetic suspension bearings: Specially designed or prepared bearing assemblies consisting of an annular magnet suspended within a housing containing a damping medium. The housing will be manufactured from a UF6-resistant material (see Explanatory Note to section 5.2 of this supplement). The magnet couples with a pole piece or a second magnet fitted to the top cap described in section 5.1.1(e) of this Supplement. The magnet may be ring-shaped with a relation between outer and inner diameter smaller or equal to 1.6:1. The magnet may be in a form having an initial permeability of 0.15 H/m (120,000 in CGS units) or more, or a remanence of 98.5% or more, or an energy product of greater than 80 kJ/m 3 (10 7 gauss-oersteds). In addition to the usual material properties, it is a prerequisite that the deviation of the magnetic axes from the geometrical axes is limited to very small tolerances (lower than 0.1 mm or 0.004 in) or that homogeneity of the material of the magnet is specially called for.

(b) Bearings/Dampers: Specially designed or prepared bearings comprising a pivot/cup assembly mounted on a damper. The pivot is normally a hardened steel shaft with a hemisphere at one end with a means of attachment to the bottom cap, described in section 5.1.1(e) of this Supplement, at the other. The shaft may however have a hydrodynamic bearing attached. The cup is pellet-shaped with a hemispherical indentation in one surface. These components are often supplied separately to the damper.

(c) Molecular pumps: Specially designed or prepared cylinders having internally machined or extruded helical grooves and internally machined bores. Typical dimensions are as follows: 75 mm (3 in) to 400 mm (16 in) internal diameter, 10 mm (0.4 in) or more wall thickness, with the length equal to or greater than the diameter. The grooves are typically rectangular in cross-section and 2 mm (0.08 in) or more in depth.

(d) Motor stators: Specially designed or prepared ring-shaped stators for high speed multiphase AC hysteresis (or reluctance) motors for synchronous operation within a vacuum in the frequency range of 600-2000 Hz and a power range of 50-1000 VA. The stators consist of multi-phase windings on a laminated low loss iron core comprised of thin layers typically 2.0 mm (0.08 in) thick or less.

(e) Centrifuge housing/recipients: Components specially designed or prepared to contain the rotor tube assembly of a gas centrifuge. The housing consists of a rigid cylinder of wall thickness up to 30 mm (1.2 in) with precision machined ends to locate the bearings and with one or more flanges for mounting. The machined ends are parallel to each other and perpendicular to the cylinder's longitudinal axis to within 0.05 degrees or less. The housing may also be a honeycomb type structure to accommodate several rotor tubes. The housings are made of or protected by materials resistant to corrosion by UF6.

(f) Scoops: Specially designed or prepared tubes of up to 12 mm (0.5 in) internal diameter for the extraction of UF6 gas from within the rotor tube by a Pitot tube action (that is, with an aperture facing into the circumferential gas flow within the rotor tube, for example by bending the end of a radially disposed tube) and capable of being fixed to the central gas extraction system. The tubes are made of or protected by materials resistant to corrosion by UF6.

5.2. Specially designed or prepared auxiliary systems, equipment and components for gas centrifuge enrichment plants

5.2.1. Feed systems/product and tails withdrawal systems

Specially designed or prepared process systems including: Feed autoclaves (or stations), used for passing UF6 to the centrifuge cascades at up to 100 kPa (15 psi) and at a rate of 1 kg/h or more; desublimers (or cold traps) used to remove UF6 from the cascades at up to 3 kPa (0.5 psi) pressure. The desublimers are capable of being chilled to 203 K (−70 °C) and heated to 343 K (70 °C); “Product” and “Tails” stations used for trapping UF6 into containers. This plant, equipment and pipework is wholly made of or lined with UF6-resistant materials (see Explanatory Note to section 5.2 of this Supplement) and is fabricated to very high vacuum and cleanliness standards.

5.2.2. Machine header piping systems

Specially designed or prepared piping systems and header systems for handling UF6 within the centrifuge cascades. The piping network is normally of the “triple” header system with each centrifuge connected to each of the headers. There is thus a substantial amount of repetition in its form. It is wholly made of UF6-resistant materials (see Explanatory Note to section 5.2 of this supplement) and is fabricated to very high vacuum and cleanliness standards.

5.2.3. UF6 mass spectrometers/ion sources

Specially designed or prepared magnetic or quadrupole mass spectrometers capable of taking “on-line” samples of feed, product or tails, from UF6 gas streams and having all of the following characteristics:

(a) Unit resolution for atomic mass unit greater than 320;

(b) Ion sources constructed of or lined with nichrome or monel or nickel plated;

(c) Electron bombardment ionization sources;

(d) Having a collector system suitable for isotopic analysis.

5.2.4. Frequency changers

Frequency changers (also known as converters or invertors) specially designed or prepared to supply motor stators (as defined under section 5.1.2(d) of this supplement), or parts, components and sub-assemblies of such frequency changers having all of the following characteristics:

(a) A multiphase output of 600 to 2000 Hz;

(b) High stability (with frequency control better than 0.1%);

(c) Low harmonic distortion (less than 2%); and

(d) An efficiency of greater than 80%.

5.3. Specially designed or prepared assemblies and components for use in gaseous diffusion enrichment

5.3.1. Gaseous diffusion barriers

(a) Specially designed or prepared thin, porous filters, with a pore size of 100-1,000 Å (angstroms), a thickness of 5 mm (0.2 in) or less, and for tubular forms, a diameter of 25 mm (1 in) or less, made of metallic, polymer or ceramic materials resistant to corrosion by UF6, and

(b) Specially prepared compounds or powders for the manufacture of such filters. Such compounds and powders include nickel or alloys containing 60 percent or more nickel, aluminum oxide, or UF6-resistant fully fluorinated hydrocarbon polymers having a purity of 99.9 percent or more, a particle size less than 10 microns, and a high degree of particle size uniformity, which are specially prepared for the manufacture of gaseous diffusion barriers.

5.3.2. Diffuser housings

Specially designed or prepared hermetically sealed cylindrical vessels greater than 300 mm (12 in) in diameter and greater than 900 mm (35 in) in length, or rectangular vessels of comparable dimensions, which have an inlet connection and two outlet connections all of which are greater than 50 mm (2 in) in diameter, for containing the gaseous diffusion barrier, made of or lined with UF6-resistant materials and designed for horizontal or vertical installation.

5.3.3. Compressors and gas blowers

Specially designed or prepared axial, centrifugal, or positive displacement compressors, or gas blowers with a suction volume capacity of 1 m 3/min or more of UF6, and with a discharge pressure of up to several hundred kPa (100 psi), designed for long-term operation in the UF6 environment with or without an electrical motor of appropriate power, as well as separate assemblies of such compressors and gas blowers. These compressors and gas blowers have a pressure ratio between 2:1 and 6:1 and are made of, or lined with, materials resistant to UF6.

5.3.4. Rotary shaft seals

Specially designed or prepared vacuum seals, with seal feed and seal exhaust connections, for sealing the shaft connecting the compressor or the gas blower rotor with the driver motor so as to ensure a reliable seal against in-leaking of air into the inner chamber of the compressor or gas blower which is filled with UF6. Such seals are normally designed for a buffer gas in-leakage rate of less than 1000 cm 3/min (60 in 3/min).

5.3.5. Heat exchangers for cooling UF6

Specially designed or prepared heat exchangers made of or lined with UF6-resistant materials (except stainless steel) or with copper or any combination of those metals, and intended for a leakage pressure change rate of less than 10 Pa (0.0015 psi) per hour under a pressure difference of 100 kPa (15 psi).

5.4. Specially designed or prepared auxiliary systems, equipment and components for use in gaseous diffusion enrichment

5.4.1. Feed systems/product and tails withdrawal systems

Specially designed or prepared process systems, capable of operating at pressures of 300 kPa (45 psi) or less, including:

(a) Feed autoclaves (or systems), used for passing UF6 to the gaseous diffusion cascades;

(b) Desublimers (or cold traps) used to remove UF6 from diffusion cascades;

(c) Liquefaction stations where UF6 gas from the cascade is compressed and cooled to form liquid UF6;

(d) “Product” or “tails” stations used for transferring UF6 into containers.

5.4.2. Header piping systems

Specially designed or prepared piping systems and header systems for handling UF6 within the gaseous diffusion cascades. This piping network is normally of the “double” header system with each cell connected to each of the headers.

5.4.3. Vacuum systems

(a) Specially designed or prepared large vacuum manifolds, vacuum headers and vacuum pumps having a suction capacity of 5 m 3/min (175 ft 3/min) or more.

(b) Vacuum pumps specially designed for service in UF6-bearing atmospheres made of, or lined with, aluminum, nickel, or alloys bearing more than 60% nickel. These pumps may be either rotary or positive, may have displacement and fluorocarbon seals, and may have special working fluids present.

5.4.4. Special shut-off and control valves

Specially designed or prepared manual or automated shut-off and control bellows valves made of UF6-resistant materials with a diameter of 40 to 1500 mm (1.5 to 59 in) for installation in main and auxiliary systems of gaseous diffusion enrichment plants.

5.4.5. UF6 mass spectrometers/ion sources

Specially designed or prepared magnetic or quadrupole mass spectrometers capable of taking “on-line” samples of feed, product or tails, from UF6 gas streams and having all of the following characteristics:

(a) Unit resolution for atomic mass unit greater than 320;

(b) Ion sources constructed of or lined with nichrome or monel or nickel plated;

(c) Electron bombardment ionization sources;

(d) Collector system suitable for isotopic analysis.

5.5. Specially designed or prepared systems, equipment and components for use in aerodynamic enrichment plants

5.5.1. Separation nozzles

Specially designed or prepared separation nozzles and assemblies thereof. The separation nozzles consist of slit-shaped, curved channels having a radius of curvature less than 1 mm (typically 0.1 to 0.05 mm), resistant to corrosion by UF6 and having a knife-edge within the nozzle that separates the gas flowing through the nozzle into two fractions.

5.5.2. Vortex tubes

Specially designed or prepared vortex tubes and assemblies thereof. The vortex tubes are cylindrical or tapered, made of or protected by materials resistant to corrosion by UF6, having a diameter of between 0.5 cm and 4 cm, a length to diameter ratio of 20:1 or less and with one or more tangential inlets. The tubes may be equipped with nozzle-type appendages at either or both ends.

5.5.3. Compressors and gas blowers

Specially designed or prepared axial, centrifugal or positive displacement compressors or gas blowers made of or protected by materials resistant to corrosion by UF6 and with a suction volume capacity of 2 m 3/min or more of UF6/carrier gas (hydrogen or helium) mixture.

5.5.4. Rotary shaft seals

Specially designed or prepared rotary shaft seals, with seal feed and seal exhaust connections, for sealing the shaft connecting the compressor rotor or the gas blower rotor with the driver motor so as to ensure a reliable seal against out-leakage of process gas or in-leakage of air or seal gas into the inner chamber of the compressor or gas blower which is filled with a UF6/carrier gas mixture.

5.5.5. Heat exchangers for gas cooling

Specially designed or prepared heat exchangers made of or protected by materials resistant to corrosion by UF6.

5.5.6. Separation element housings

Specially designed or prepared separation element housings, made of or protected by materials resistant to corrosion by UF6, for containing vortex tubes or separation nozzles.

5.5.7. Feed systems/product and tails withdrawal systems

Specially designed or prepared process systems or equipment for enrichment plants made of or protected by materials resistant to corrosion by UF6, including:

(a) Feed autoclaves, ovens, or systems used for passing UF6 to the enrichment process;

(b) Desublimers (or cold traps) used to remove UF6 from the enrichment process for subsequent transfer upon heating;

(c) Solidification or liquefaction stations used to remove UF6 from the enrichment process by compressing and converting UF6 to a liquid or solid form;

(d) “Product” or “tails” stations used for transferring UF6 into containers.

5.5.8. Header piping systems

Specially designed or prepared header piping systems, made of or protected by materials resistant to corrosion by UF6, for handling UF6 within the aerodynamic cascades. This piping network is normally of the “double” header design with each stage or group of stages connected to each of the headers.

5.5.9. Vacuum systems and pumps

(a) Specially designed or prepared vacuum systems having a suction capacity of 5 m 3/min or more, consisting of vacuum manifolds, vacuum headers and vacuum pumps, and designed for service in UF6-bearing atmospheres;

(b) Vacuum pumps specially designed or prepared for service in UF6-bearing atmospheres and made of or protected by materials resistant to corrosion by UF6. These pumps may use fluorocarbon seals and special working fluids.

5.5.10. Special shut-off and control valves

Specially designed or prepared manual or automated shut-off and control bellows valves made of or protected by materials resistant to corrosion by UF6 with a diameter of 40 to 1500 mm for installation in main and auxiliary systems of aerodynamic enrichment plants.

5.5.11. UF6 mass spectrometers/ion sources

Specially designed or prepared magnetic or quadrupole mass spectrometers capable of taking “on-line” samples of feed, “product” or “tails,” from UF6 gas streams and having all of the following characteristics:

(a) Unit resolution for mass greater than 320;

(b) Ion sources constructed of or lined with nichrome or monel or nickel plated;

(c) Electron bombardment ionization sources;

(d) Collector system suitable for isotopic analysis.

5.5.12. UF6/carrier gas separation systems

Specially designed or prepared process systems for separating UF6 from carrier gas (hydrogen or helium).

(a) Cryogenic heat exchangers and cryoseparators capable of temperatures of −120 °C or less, or

(b) Cryogenic refrigeration units capable of temperatures of −120 °C or less, or

(c) Separation nozzle or vortex tube units for the separation of UF6 from carrier gas, or

(d) UF6 cold traps capable of temperatures of −20 °C or less.

5.6. Specially designed or prepared systems, equipment and components for use in chemical exchange or ion exchange enrichment plants

5.6.1. Liquid-liquid exchange columns (Chemical exchange)

Countercurrent liquid-liquid exchange columns having mechanical power input (i.e., pulsed columns with sieve plates, reciprocating plate columns, and columns with internal turbine mixers), specially designed or prepared for uranium enrichment using the chemical exchange process. For corrosion resistance to concentrated hydrochloric acid solutions, these columns and their internals are made of or protected by suitable plastic materials (such as fluorocarbon polymers) or glass. The stage residence time of the columns is designed to be short (30 seconds or less).

5.6.2. Liquid-liquid centrifugal contactors (Chemical exchange)

Liquid-liquid centrifugal contactors specially designed or prepared for uranium enrichment using the chemical exchange process. Such contactors use rotation to achieve dispersion of the organic and aqueous streams and then centrifugal force to separate the phases. For corrosion resistance to concentrated hydrochloric acid solutions, the contactors are made of or are lined with suitable plastic materials (such as fluorocarbon polymers) or are lined with glass. The stage residence time of the centrifugal contactors is designed to be short (30 seconds or less).

5.6.3. Uranium reduction systems and equipment (Chemical exchange)

(a) Specially designed or prepared electrochemical reduction cells to reduce uranium from one valence state to another for uranium enrichment using the chemical exchange process. The cell materials in contact with process solutions must be corrosion resistant to concentrated hydrochloric acid solutions.

(b) Specially designed or prepared systems at the product end of the cascade for taking the U4+ out of the organic stream, adjusting the acid concentration and feeding to the electrochemical reduction cells.

5.6.4. Feed preparation systems (Chemical exchange)

Specially designed or prepared systems for producing high-purity uranium chloride feed solutions for chemical exchange uranium isotope separation plants.

5.6.5. Uranium oxidation systems (Chemical exchange)

Specially designed or prepared systems for oxidation of U3+ to U4+ for return to the uranium isotope separation cascade in the chemical exchange enrichment process.

5.6.6. Fast-reacting ion exchange resins/adsorbents (ion exchange)

Fast-reacting ion-exchange resins or adsorbents specially designed or prepared for uranium enrichment using the ion exchange process, including porous macroreticular resins, and/or pellicular structures in which the active chemical exchange groups are limited to a coating on the surface of an inactive porous support structure, and other composite structures in any suitable form including particles or fibers. These ion exchange resins/adsorbents have diameters of 0.2 mm or less and must be chemically resistant to concentrated hydrochloric acid solutions as well as physically strong enough so as not to degrade in the exchange columns. The resins/adsorbents are specially designed to achieve very fast uranium isotope exchange kinetics (exchange rate half-time of less than 10 seconds) and are capable of operating at a temperature in the range of 100 °C to 200 °C.

5.6.7. Ion exchange columns (Ion exchange)

Cylindrical columns greater than 1,000 mm in diameter for containing and supporting packed beds of ion exchange resin/adsorbent, specially designed or prepared for uranium enrichment using the ion exchange process. These columns are made of or protected by materials (such as titanium or fluorocarbon plastics) resistant to corrosion by concentrated hydrochloric acid solutions and are capable of operating at a temperature in the range of 100 °C to 200 °C and pressures above 0.7 MPa (102 psia).

5.6.8. Ion exchange reflux systems (Ion exchange)

(a) Specially designed or prepared chemical or electrochemical reduction systems for regeneration of the chemical reducing agent(s) used in ion exchange uranium enrichment cascades.

(b) Specially designed or prepared chemical or electrochemical oxidation systems for regeneration of the chemical oxidizing agent(s) used in ion exchange uranium enrichment cascades.

5.7. Specially designed or prepared systems, equipment and components for use in laser-based enrichment plants

5.7.1. Uranium vaporization systems (AVLIS)

Specially designed or prepared uranium vaporization systems which contain high-power strip or scanning electron beam guns with a delivered power on the target of more than 2.5 kW/cm.

5.7.2. Liquid uranium metal handling systems (AVLIS)

Specially designed or prepared liquid metal handling systems for molten uranium or uranium alloys, consisting of crucibles and cooling equipment for the crucibles.

5.7.3. Uranium metal ‘product’ and ‘tails’ collector assemblies (AVLIS)

Specially designed or prepared “product” and “tails” collector assemblies for uranium metal in liquid or solid form.

5.7.4. Separator module housings (AVLIS)

Specially designed or prepared cylindrical or rectangular vessels for containing the uranium metal vapor source, the electron beam gun, and the “product” and “tails” collectors.

5.7.5. Supersonic expansion nozzles (MLIS)

Specially designed or prepared supersonic expansion nozzles for cooling mixtures of UF6 and carrier gas to 150 K or less and which are corrosion resistant to UF6.

5.7.6. Uranium pentafluoride product collectors (MLIS)

Specially designed or prepared uranium pentafluoride (UF5) solid product collectors consisting of filter, impact, or cyclone-type collectors, or combinations thereof, and which are corrosion resistant to the UF5/UF6 environment.

5.7.7. UF6/carrier gas compressors (MLIS)

Specially designed or prepared compressors for UF6/carrier gas mixtures, designed for long term operation in a UF6 environment. The components of these compressors that come into contact with process gas are made of or protected by materials resistant to corrosion by UF6.

5.7.8. Rotary shaft seals (MLIS)

Specially designed or prepared rotary shaft seals, with seal feed and seal exhaust connections, for sealing the shaft connecting the compressor rotor with the driver motor so as to ensure a reliable seal against out-leakage of process gas or in-leakage of air or seal gas into the inner chamber of the compressor which is filled with a UF6/carrier gas mixture.

5.7.9. Fluorination systems (MLIS)

Specially designed or prepared systems for fluorinating UF5 (solid) to UF6 (gas).

5.7.10. UF6 mass spectrometers/ion sources (MLIS)

Specially designed or prepared magnetic or quadrupole mass spectrometers capable of taking “on-line” samples of feed, “product,” or “tails” from UF6 gas streams and having all of the following characteristics:

(a) Unit resolution for mass greater than 320;

(b) Ion sources constructed of or lined with nichrome or monel or nickel plated;

(c) Electron bombardment ionization sources; and

(d) Collector system suitable for isotopic analysis.

5.7.11. Feed systems/product and tails withdrawal systems (MLIS)

Specially designed or prepared process systems or equipment for enrichment plants made of or protected by materials resistant to corrosion by UF6, including:

(a) Feed autoclaves, ovens, or systems used for passing UF6 to the enrichment process;

(b) Desublimers (or cold traps) used to remove UF6 from the enrichment process for subsequent transfer upon heating;

(c) Solidification or liquefaction stations used to remove UF6 from the enrichment process by compressing and converting UF6 to a liquid or solid form;

(d) “Product” or “tails” stations used for transferring UF6 into containers.

5.7.12. UF6/carrier gas separation systems (MLIS)

Specially designed or prepared process systems for separating UF6 from carrier gas. The carrier gas may be nitrogen, argon, or other gas.

5.7.13. Laser systems (AVLIS, MLIS and CRISLA)

Lasers or laser systems specially designed or prepared for the separation of uranium isotopes.

5.8. Specially designed or prepared systems, equipment and components for use in plasma separation enrichment plants

5.8.1. Microwave power sources and antennae

Specially designed or prepared microwave power sources and antennae for producing or accelerating ions and having the following characteristics: Greater than 30 GHz frequency and greater than 50 kW mean power output for ion production.

5.8.2. Ion excitation coils

Specially designed or prepared radio frequency ion excitation coils for frequencies of more than 100 kHz and capable of handling more than 40 kW mean power.

5.8.3. Uranium plasma generation systems

Specially designed or prepared systems for the generation of uranium plasma, which may contain high-power strip or scanning electron beam guns with a delivered power on the target of more than 2.5 kW/cm.

5.8.4. Liquid uranium metal handling systems

Specially designed or prepared liquid metal handling systems for molten uranium or uranium alloys, consisting of crucibles and cooling equipment for the crucibles, power supply system, the ion source high-voltage power supply system, the vacuum system, and extensive chemical handling systems for recovery of product and cleaning/recycling of components.

5.9.1. Electromagnetic isotope separators

Electromagnetic isotope separators specially designed or prepared for the separation of uranium isotopes, and equipment and components therefor, including:

(a) Ion sources: Specially designed or prepared single or multiple uranium ion sources consisting of a vapor source, ionizer, and beam accelerator, constructed of suitable materials such as graphite, stainless steel, or copper, and capable of providing a total ion beam current of 50 mA or greater;

(b) Ion collectors: Collector plates consisting of two or more slits and pockets specially designed or prepared for collection of enriched and depleted uranium ion beams and constructed of suitable materials such as graphite or stainless steel;

(c) Vacuum housings: Specially designed or prepared vacuum housings for uranium electromagnetic separators, constructed of suitable non-magnetic materials such as stainless steel and designed for operation at pressures of 0.1 Pa or lower;

(d) Magnet pole pieces: Specially designed or prepared magnet pole pieces having a diameter greater than 2 m used to maintain a constant magnetic field within an electromagnetic isotope separator and to transfer the magnetic field between adjoining separators.

5.9.2. High voltage power supplies

Specially designed or prepared high-voltage power supplies for ion sources, having all of the following characteristics: capable of continuous operation, output voltage of 20,000 V or greater, output current of 1 A or greater, and voltage regulation of better than 0.01% over a time period of 8 hours.

5.9.3. Magnet power supplies

Specially designed or prepared high-power, direct current magnet power supplies having all of the following characteristics: capable of continuously producing a current output of 500 A or greater at a voltage of 100 V or greater and with a current or voltage regulation better than 0.01% over a period of 8 hours.

6. Plants for the production of heavy water, deuterium and deuterium compounds and equipment specially designed or prepared therefor

6.1. Water-hydrogen sulfide exchange towers

Exchange towers fabricated from fine carbon steel (such as ASTM A516) with diameters of 6 m (20 ft) to 9 m (30 ft), capable of operating at pressures greater than or equal to 2 MPa (300 psi) and with a corrosion allowance of 6 mm or greater, specially designed or prepared for heavy water production utilizing the water-hydrogen sulfide exchange process.

6.2. Blowers and compressors

Single stage, low head (i.e., 0.2 MPa or 30 psi) centrifugal blowers or compressors for hydrogen-sulfide gas circulation (i.e., gas containing more than 70% H2S) specially designed or prepared for heavy water production utilizing the water-hydrogen sulfide exchange process. These blowers or compressors have a throughput capacity greater than or equal to 56 m 3/second (120,000 SCFM) while operating at pressures greater than or equal to 1.8 MPa (260 psi) suction and have seals designed for wet H2S service.

6.3. Ammonia-hydrogen exchange towers

Ammonia-hydrogen exchange towers greater than or equal to 35 m (114.3 ft) in height with diameters of 1.5 m (4.9 ft) to 2.5 m (8.2 ft) capable of operating at pressures greater than 15 MPa (2225 psi) specially designed or prepared for heavy water production utilizing the ammonia-hydrogen exchange process. These towers also have at least one flanged axial opening of the same diameter as the cylindrical part through which the tower internals can be inserted or withdrawn.

6.4. Tower internals and stage pumps

Tower internals and stage pumps specially designed or prepared for towers for heavy water production utilizing the ammonia-hydrogen exchange process. Tower internals include specially designed stage contactors which promote intimate gas/liquid contact. Stage pumps include specially designed submersible pumps for circulation of liquid ammonia within a contacting stage internal to the stage towers.

6.5. Ammonia crackers

Ammonia crackers with operating pressures greater than or equal to 3 MPa (450 psi) specially designed or prepared for heavy water production utilizing the ammonia-hydrogen exchange process.

6.6. Infrared absorption analyzers

Infrared absorption analyzers capable of “on-line” hydrogen/deuterium ratio analysis where deuterium concentrations are equal to or greater than 90%.

6.7. Catalytic burners

Catalytic burners for the conversion of enriched deuterium gas into heavy water specially designed or prepared for heavy water production utilizing the ammonia-hydrogen exchange process.

7. Plants for the conversion of uranium and equipment specially designed or prepared therefor

7.1. Specially designed or prepared systems for the conversion of uranium ore concentrates to UO3

7.2. Specially designed or prepared systems for the conversion of UO3 to UF6

7.3. Specially designed or prepared systems for the conversion of UO3 to UO2

7.4. Specially designed or prepared systems for the conversion of UO2 to UF4

7.5. Specially designed or prepared systems for the conversion of UF4 to UF6

7.6. Specially designed or prepared systems for the conversion of UF4 to U metal

7.7. Specially designed or prepared systems for the conversion of UF6 to UO2

7.8 Specially designed or prepared systems for the conversion of UF6 to UF4